Infrastructure

Project Description

The public infrastructure scope will include the construction of new roads, the reconstruction of existing roads, and additional roadway improvements. This will include new traffic signals, modifications to existing traffic signals and all associated streetscape and landscaping. In addition to road work, new dry and wet utilities will be installed to serve the future development sites and a new retaining wall will be constructed along the adjacent Metra tracks.

GRIT has committed to at least 50% Chicago residency from the project's workforce, 30% MBE participation, 10% WBE participation, and aims to achieve 65% minority-led business participation. Infrastructure work has begun in Summer 2023, with completion expected in late 2025.

We look forward to learning more about your company through our RFP process. 


Bid Packages

Coming Soon

  • Concrete — Q2 2024

  • Electrical — Q2 2024

  • Streetscaping — Q2 2024

  • Traffic Signals — Q2 2024

  • Landscaping — Q4 2024

  • Asphalt — Q4 2024

Closed

  • Demolition

  • Dry Utilities

  • Earthwork

  • Retaining Wall

  • Wet Utilities

 

Frequently asked questions

  • GRIT is the General Contractor for the Public Infrastructure Improvements project, with SPACECO serving as the project’s Construction Manager.

  • Yes. GRIT has committed to the following:

    50% City of Chicago residency (total worker hours)

    30% MBE (City of Chicago and Cook County certified firms only)

    10% WBE (City of Chicago and Cook County certified firms only)

  • Package releases will be communicated via email to all subcontractors on the project distribution list. You can sign up for the distribution list by filling out the "Request more information” form accessed via the button above or by scrolling down. Emails will be sent by Ta Juana Tang of Tandem Ventures.

  • Yes. Certified payroll will be submitted each week. For this project we will utilize both LCPTracker and Skillsmart for certified payroll reporting. Our compliance consultant will provide training on both systems.

  • This project is governed by Illinois Prevailing Wages. As such, the Illinois Prevailing wage rate, including applicable fringe benefits, at a minimum, will be required.

  • Please send an email to bl@tandemventures.com and one of our team members will get back to you shortly.

ACCESS BID PACKAGE DOCUMENTS

To access the bid package and related documents for this opportunity, please fill out and submit the form.

Upon submission of the form, you will be automatically directed to a new page with more information. Please save that link for quick access to the bid package documents going forward.